Excavator Hourly Rate Calculator
Machine and labor at cost, overhead spread across your billable hours, then margin on top — so you know what you actually need to charge per hour, and what it costs you when the iron sits.
The machine (at cost)
Machine cost: $48.00/hr
($2,500.00 + $350.00) ÷ 150 hr + 4.0 gal/hr × $3.50 + $15.00 reserve
Labor (at cost)
Loaded operator
$37.50/hr
$30.00 wage + 25% burden
Labor cost
$72.50/hr
Operator + 1 laborer(s), at cost
Overhead recovery
Drag it — hours you actually sell in a year, not hours you hope to sell. More billable hours spread the same overhead thinner.
Overhead per billable hour: $60.00/hr
$60,000.00 ÷ 1,000 billable hours
Profit
Profit at this margin
$45.13/hr
On every billed hour
Your hourly rate
LiveCharge rate
$225.63/hr
Profit: $45.13/hr on every billed hour
Machine cost/hr
$48.00
Labor cost/hr
$72.50
True cost/hr
$120.50
Break-even/hr
$180.50
At 1,000 billable hours a year, overhead costs you $60.00 every hour — billed or not.
Charge rate
$225.63/hr
Break-even
$180.50/hr
Earthwork AI runs this math on every estimate
Your overhead becomes an hourly charge automatically, machines and labor priced at cost, profit added at the end.
How to Price Your Excavator Hourly Rate (Without Working for Free)
Ask ten contractors what an excavator is worth per hour and you'll get ten confident answers. The problem is that none of them know your machine payment, your insurance, your fuel bill, or how many hours you actually bill in a year. An hourly rate isn't a market price — it's your cost structure with a margin on top.
Why national averages don't help you
The published range for a mid-size excavator — roughly $110 to $150 an hour — averages companies that look nothing like each other. It includes the guy with a paid-off 2012 machine working out of his pickup, and the company with a $2,500-a-month payment on a new 20-ton, a shop, a service truck, and office help. Same machine size, twice the cost per hour. Price off the average and one of you is losing money — and it's usually the one with the bigger nut. Averages tell you where the market sits. They can't tell you what you need.
Cost at cost, then the charge rate
There are two different numbers here, and mixing them up is the most common mistake. The first is what the machine and the crew cost you per hour — at cost, nothing added. Fuel, maintenance reserve, insurance, the payment spread across the hours the machine actually runs, wages plus payroll burden. No overhead, no profit. That's your true cost.
The second number is the charge rate: what goes on the invoice. Profit and overhead don't belong inside the machine line or the labor line. Bury a margin in your machine rate and you'll double-count it later, and you'll have no idea what the machine actually costs you. Keep cost at cost, and put everything else on top where you can see it.
Overhead per billable hour — the part nobody prices
Overhead is everything that costs money whether or not the iron is running: the office, the shop, truck payments, liability insurance, the phone, the accountant, the software. Most contractors carry it in their head and then "add a little" at the end. That's how you end up working for free.
Here's the honest way: take your annual overhead and divide it by the hours you actually bill in a year. $60,000 of overhead over 1,000 billable hours is $60 an hour — $60 you owe yourself on every hour that goes on a ticket, before you've made a dime. Notice what that means. Overhead burns whether the machine is working or not. Every hour the excavator sits, you still pay the insurance, the payment, the phone. The only thing that changes is whether you're collecting for it.
More billable hours, lower rate
That's why the billable-hours slider matters more than anything else on this page. Drag it from 800 to 1,600 hours and watch the overhead line fall. Same overhead, spread over twice the work, halves the hourly recovery. Bill 1,600 hours instead of 800 and you can charge less per hour and still cover the same overhead — or charge the same and finally pay yourself.
Two ways to raise that number: sell more work, and stop giving hours away on change orders, callbacks, and "while you're here" favors. Both are worth more than another point of margin. Run your numbers here, then run them again with the hours you billed last year — not the hours you wish you had.
Typical range: most excavation companies land between $110 and $150 per hour for a mid-size machine, but that number is an output of your costs — never the input.
Excavator hourly rate FAQ
For a mid-size excavator, published averages land somewhere between $110 and $150 an hour. Treat that as a market check, not a target. A paid-off machine and a new one carrying a $2,500 monthly payment can be the same size and still need very different rates, and the average says nothing about your overhead or how many hours you bill in a year.